Project Details

  • Client: Comisión Federal de Electricidad
  • Services: Engineering Consulting, Nuclear Power Generation, Project Integrator, Project Management, Specialty Coating & FRP Contractor​
  • Industry type: Nuclear Power Generation
  • Location: Veracruz, México

About Project

The executed Nuclear Coating Service Level 1 Condition Assessment Coating inspections in both the Drywell and Wetwell are important containment-integrity activities, particularly because the primary containment incorporates a steel liner plate that serves as the primary leakage barrier. This task is NRC mandated (e.g. GL 98-04, RG 1.58), supported by Standard ASTM D-5162-08, and is also a LVNPP License Extension Commitment with the Mexican Nuclear Regulator CNSNS.

The purpose of the inspection was to identify coating degradation that could:

  • Reduce corrosion protection of carbon-steel surfaces.
  • Expose the containment liner or structural steel to corrosion.
  • Produce loose coating material.
  • Affect safety-related equipment or systems.
  • Require repair, engineering evaluation, or continued monitoring.
  • Potentially become debris following a Design Basis Accident (DBA

Services provided