About Project
Managed, Developed and Implemented a Multi-million dollar World Class Power Operated Valves (POV) Program at FENOC’s Beaver Valley Nuclear Power Station. This nuclear station is made up of two Westinghouse’s Pressurized Water Reactors with a combined electrical output of 2300 Megawatts.
Services Provided
Responsibilities included but were not limited to:
- Management of the overall development and implementation of the POV program in a quality, timely and efficient manner.
- Generation of System and Component level design basis review calculations.
- Establishment of a Preventive Maintenance program.
- Risk informed categorization of components based on probabilistic risk analysis and other relevant industry data / guidance and methodologies.
- Generation and implementation of process improvements strategies for work activities, data management and documentation, including the creation of equipment databases and software.
- Establish component diagnostic testing strategies, acceptance criteria, and frequencies.
- Procurement & Purchasing.
- Provide Personnel Training as related to the development, implementation and maintenance of POV program.
- Design basis reconstitution and reconciliation.
- Establishment of a Performance Monitoring and Trending program.
- Development and implementation of Setpoint Control calculations, and related data management database, for maintenance department usage in future testing activities.
- Generation of the corporate and site specific POV Program Administrative Procedure which included identification of methodologies, organizations, responsibilities, interfaces, procedures, and controls necessary for program implementation.
- Component Reliability and Availability improvement.
- Design changes and modifications.